DKFS Museum Bridge Central Section Installed





DKFS Museum Bridge installation has started in Luedenscheid, Germany.

The footage shows the 50 tons central section lifted into place. The bridge is being fabricated and assembled in 3 parts. The central section was lifted in during night/very early morning to not interrupt train service. 

Architects:                           DKFS Architects         >>link here   
Client:                                  City of Luedenscheid
Structural Consultants:      Concept:  Jane Wernick Associates, London, UK   PE: Colin Jackson 
                                              Execution: Werner Sobek Ingenieure, Stuttgart, GER
                                                                                       
Light Design:                       Speirs+Major, London
                                              DIAL Light Design, Luedenscheid
Steelwork Contractor:         Rohlfing Stahlbau
Lift Contractor:                    Heinzerling Hydraulic Lifts


                                    

 
dirk krolikowski | web site 2015 |